H399--FTD Roof Inspection - Service Contract

Due Jul 31, 2026·3 days left·RoofingView official posting ↗
Issuing agency
Department of Veterans Affairs
Method
Solicitation
Category
NAICS 541350
PIN
36C25026Q0698
Location
Ohio
Posted
Jul 22, 2026
Takeaways by LightRFP AI
  • The Department of Veterans Affairs issued Request for Quote (RFQ) 36C25026Q0698 for a roof inspection service contract at the Ft. Thomas Domiciliary (FTD) in Ft. Thomas, Kentucky.
  • The scope covers one roof area of approximately 25,000 square feet on Building 64, accessible via stairwell, with structural framing assessment from the vacant floor below.
  • The Performance Work Statement (PWS) and existing roof plan drawings have been uploaded to SAM.gov for offerors.
  • No site visit or walkthrough will be offered prior to quote submission.
  • Questions were due by the RFI process documented in the Q&A; the quote due date is 2026-07-31 at 13:00 ET.
  • The procurement is a Total Small Business Set-Aside under NAICS 541350.
  • Requirement: Prime contractor must maintain the required insurance; subcontractor insurance does not satisfy the requirement.
  • Requirement: Written approval is required prior to any destructive testing or investigation (e.g., test cuts, core samples).
  • Requirement: Drones may be used for infrared scans in accordance with Ft. Thomas, KY drone regulations; time/day to be coordinated with the COR.
  • Requirement: PE stamp is not required on the structural assessment report.
  • Requirement: Specific infrared thermography certification is not mandated; the contractor must be able to determine water intrusion.
  • Requirement: Structural assessment per IEBC is adequate; IBC assessment is not required.

AI-generated, verify all details against the official documents.

Description

FT. THOMAS DOMICLIARY (FTD) ROOF INSPECTION
FOR THE
FT. THOMAS DOMICLIARY (FTD) - FT. THOMAS, KY
QUESTIONS AND ANSWERS (RFIs)
TO REQUEST FOR QUOTE (RFQ) NUMBER
36C25026Q0698

QUESTIONS AND ANSWERS

RFI #1 Question: Is the full Performance Work Statement (PWS) or Statement of Work available yet, or will it be issued closer to the solicitation date? We currently only have the presolicitation notice.

Answer: Yes. The PWS has been uploaded to www.SAM.gov
RFI #2 Question: For the structural/decking framing assessment component, is a licensed Professional Engineer (PE) stamp/certification required on the report, or is a qualified visual and probe-based structural assessment sufficient to meet the requirement?

Answer: PE Stamp is not required.

RFI #3 Question: Is there a specific infrared thermography certification standard the Government requires (e.g., Infraspection Institute, InterNACHI, ASNT), or is any recognized industry certification acceptable?

Answer: Specific infrared tech does not matter, must be able to determine water intrusion.

RFI #4 Question: Will there be a site visit or walkthrough offered prior to quote submission?

Answer: No.

RFI #5 Question: We would like to know if someone has the roof size, number of buildings or any building plan we can use to draft a quote.

Answer: SF is roughly the same as the 3rd floor ~25,000SF. There is only one (1) building. See attachment for roof plan.

RFI #6 Question: We need additional information to quantify the number of roof areas, square footage, and method of accessing the roof areas to prepare a firm offer. 

Answer: One (1) roof area. SF is roughly the same as the 3rd floor ~25,000SF. Accessible from stairwell. See attachment for roof plan.

RFI #7 Question: Is the roof assessment limited to the main building only, or does it include multiple buildings within the Ft. Thomas Campus? If multiple buildings are included, would you please identify the applicable building(s)?
Answer: One roof area on main building (Building 64).
RFI #8 Question: The Performance Work Statement indicates that existing roof and building floor plans will be provided when available. Could you please confirm whether these plans are currently available.

Answer: Photos of existing drawings attached.

RFI #9 Question: The PWS requires an assessment of the roof decking and structural framing where accessible. Could you please provide additional information regarding the anticipated accessibility of the structural framing (e.g., attic access, exposed framing, ceiling access, or other accessible areas)?

Answer: Above ceiling from floor below. Floor below is currently vacant.
RFI #10 Question: What is access to the roof?

Answer: Roof is accessible via stairs.
RFI #11 Question: What is the total size of the assessment area (SF)?

Answer: ~25,000SF

RFI #12 Question: Is the roof currently under warranty?

Answer: No

RFI 13 Question: Has environmental testing been performed?

Answer: No

RFI #14 Question: Can existing drawings be shared during the bid phase?

Answer: Photos of existing drawings attached.

RFI #15 Question: Are canopies included?

Answer: No

RFI #16 Question: Is the facility occupied and will it be in operation during the deck inspection?

Answer: The facility is occupied and will be in operation during the inspection. The floor immediately below is vacant and accessible.

RFI #17 Question: Is a structural assessment per IEBC adequate?  Or is an IBC assessment required?

Answer: IEBC is adequate.

RFI #18 Question: Can a drone be utilized for an IR scan?
If so, can IR scan be performed during sunrise or sundown hours?

Answer: Drones can be used in accordance with Ft Thomas, KY drone regulations. Time/day to be coordinated with COR once in construction.

RFI #19 Question: Are RF antennas present?
If so, is there interest in the winning contractor performing an RF survey (includes an RF heatmap)?

Answer: RF Antennas may be present. No RF heatmap will be required.

RFI #20 Question: Can windows be utilized for access for lower roofs?

Answer: There is only one roof, accessible via stairwell.

RFI #21 Question: Could you identify the roof system types for the approximately 15 roof areas (for example, EPDM, TPO, modified bitumen, built-up/ballasted, etc.)? This will help us determine the appropriate moisture survey methodology.

Answer: Refer to existing drawings for roof type.

RFI #22 Question: The PWS references existing roof plan files. Are those plans available to offerors before award, or will they only be provided to the successful contractor?

Answer: Photos of existing drawings attached.
RFI #23 Question: If limited test cuts or core samples become necessary to verify concealed roof conditions, would prior written approval from the VA be required before performing that work?
Answer: Written approval is required prior to any destructive testing/investigation.

RFI #24 Question: I would also appreciate clarification regarding the insurance requirement. If Nine3Six Solutions serves as the prime contractor and utilizes a qualified roofing inspection subcontractor to perform the on-site technical inspection services, does the solicitation require the prime contractor to maintain the insurance specified in the solicitation, or would the subcontractor's insurance satisfy that requirement for the services they perform?
Answer: Yes, the prime contractor shall maintain the required insurance and not the subcontractor.
RFI #25 Question: Lastly, I noticed Attachment VAAR 852.219-75 (Limitations on Subcontracting Certificate). Since this procurement is identified as a Total Small Business Set-Aside under NAICS 541350 rather than a VOSB or SDVOSB set-aside, could you please confirm whether that attachment is applicable to this acquisition?
Answer: This has been rescinded (VAAR 852.219-75).

Documents19
S2-3 Drawing.jpegJPEG
S2-2 Drawing.jpegJPEG
S2-1 Drawing.jpegJPEG
S1-8 Drawing.jpegJPEG
S1-7 Drawing.jpegJPEG
S1-6 Drawing.jpegJPEG
S1-5 Drawing - Reference.jpegJPEG
S1-4 Drawing.jpegJPEG
S1-3 Drawing.jpegJPEG
S1-2 Drawing.jpegJPEG
S1-1 Drawing.jpegJPEG
Ft Thomas Roof Plan.pdfPDF
36C25026Q0698 0001.docxDOCX
Security Information.pdfPDF
Rules of Behavior.pdfPDF
Instructions for VAAR 852.219-75.docxDOCX
FTD Roof Inspection - PWS.pdfPDF
SCA Wage determination 2015-4719.pdfPDF
36C25026Q0698_1.docxDOCX

Contact

Name
Ronald T Heidemann
Address
OH 45428
Full source recordfrom SAM.gov
Type
Solicitation
Title
H399--FTD Roof Inspection - Service Contract
Active
Yes
Base Type
Solicitation
Notice Id
17986a319541479ba5906af14cba349e
Naics Code
541350
Department
DEPARTMENT OF VETERANS AFFAIRS
Posted Date
Jul 22, 2026
Office Address
State
OH
Zipcode
45428
Country Code
USA
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e86b2af43e56472c82a81a6d09594ae2/download?fn=S2-3%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7d9be6f8c11d4bfe8813481a35bc4344/download?fn=S2-2%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6bf51666727b4291a37bd711b8c7d3fc/download?fn=S2-1%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cdf06408fbf5457291f92285ecf1061f/download?fn=S1-8%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f106f562f7ee480b9eb9bdf9a07cf2b3/download?fn=S1-7%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ab9b5e00829b4262933c6cff03e9bf7a/download?fn=S1-6%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7177a146f03342d5a96589da32426dbe/download?fn=S1-5%20Drawing%20-%20Reference.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7818289205ba45bd82b2ecaa86297215/download?fn=S1-4%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bbc5157d39d6488bb9248368597580de/download?fn=S1-3%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2dd3cc783b5845aab0c0387970caba32/download?fn=S1-2%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/76becc4a6c5d4c00ae1e8ca50036af67/download?fn=S1-1%20Drawing.jpeg, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/75e25fef708241129e8f67d4cb18973a/download?fn=Ft%20Thomas%20Roof%20Plan.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e44bf60f9fc94f32a553f2df5d7986e5/download?fn=36C25026Q0698%200001.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/82a9d57f15054e65b45c52203000a29b/download?fn=Security%20Information.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/505cef895d184016ac0a482baaf8e2e2/download?fn=Rules%20of%20Behavior.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ec7a2f8b5bf74d23ac9daa4fbc8246bd/download?fn=Instructions%20for%20VAAR%20852.219-75.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c245968a1e0a4df59d99ed6863291266/download?fn=FTD%20Roof%20Inspection%20%20-%20PWS.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f66a9b7d049b496c85321a59f79947a5/download?fn=SCA%20Wage%20determination%202015-4719.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d64604d39c484229997ee7b69c49ae05/download?fn=36C25026Q0698_1.docx
Point Of Contact
Type
primary
Email
Ronald.Heidemann@va.gov
Title
Contracting Officer
Full Name
Ronald T Heidemann
Description Text
FT. THOMAS DOMICLIARY (FTD) ROOF INSPECTION FOR THE FT. THOMAS DOMICLIARY (FTD) - FT. THOMAS, KY QUESTIONS AND ANSWERS (RFIs) TO REQUEST FOR QUOTE (RFQ) NUMBER 36C25026Q0698 QUESTIONS AND ANSWERS RFI #1 Question: Is the full Performance Work Statement (PWS) or Statement of Work available yet, or will it be issued closer to the solicitation date? We currently only have the presolicitation notice. Answer: Yes. The PWS has been uploaded to www.SAM.gov RFI #2 Question: For the structural/decking framing assessment component, is a licensed Professional Engineer (PE) stamp/certification required on the report, or is a qualified visual and probe-based structural assessment sufficient to meet the requirement? Answer: PE Stamp is not required. RFI #3 Question: Is there a specific infrared thermography certification standard the Government requires (e.g., Infraspection Institute, InterNACHI, ASNT), or is any recognized industry certification acceptable? Answer: Specific infrared tech does not matter, must be able to determine water intrusion. RFI #4 Question: Will there be a site visit or walkthrough offered prior to quote submission? Answer: No. RFI #5 Question: We would like to know if someone has the roof size, number of buildings or any building plan we can use to draft a quote. Answer: SF is roughly the same as the 3rd floor ~25,000SF. There is only one (1) building. See attachment for roof plan. RFI #6 Question: We need additional information to quantify the number of roof areas, square footage, and method of accessing the roof areas to prepare a firm offer.  Answer: One (1) roof area. SF is roughly the same as the 3rd floor ~25,000SF. Accessible from stairwell. See attachment for roof plan. RFI #7 Question: Is the roof assessment limited to the main building only, or does it include multiple buildings within the Ft. Thomas Campus? If multiple buildings are included, would you please identify the applicable building(s)? Answer: One roof area on main building (Building 64). RFI #8 Question: The Performance Work Statement indicates that existing roof and building floor plans will be provided when available. Could you please confirm whether these plans are currently available. Answer: Photos of existing drawings attached. RFI #9 Question: The PWS requires an assessment of the roof decking and structural framing where accessible. Could you please provide additional information regarding the anticipated accessibility of the structural framing (e.g., attic access, exposed framing, ceiling access, or other accessible areas)? Answer: Above ceiling from floor below. Floor below is currently vacant. RFI #10 Question: What is access to the roof? Answer: Roof is accessible via stairs. RFI #11 Question: What is the total size of the assessment area (SF)? Answer: ~25,000SF RFI #12 Question: Is the roof currently under warranty? Answer: No RFI 13 Question: Has environmental testing been performed? Answer: No RFI #14 Question: Can existing drawings be shared during the bid phase? Answer: Photos of existing drawings attached. RFI #15 Question: Are canopies included? Answer: No RFI #16 Question: Is the facility occupied and will it be in operation during the deck inspection? Answer: The facility is occupied and will be in operation during the inspection. The floor immediately below is vacant and accessible. RFI #17 Question: Is a structural assessment per IEBC adequate?  Or is an IBC assessment required? Answer: IEBC is adequate. RFI #18 Question: Can a drone be utilized for an IR scan? If so, can IR scan be performed during sunrise or sundown hours? Answer: Drones can be used in accordance with Ft Thomas, KY drone regulations. Time/day to be coordinated with COR once in construction. RFI #19 Question: Are RF antennas present? If so, is there interest in the winning contractor performing an RF survey (includes an RF heatmap)? Answer: RF Antennas may be present. No RF heatmap will be required. RFI #20 Question: Can windows be utilized for access for lower roofs? Answer: There is only one roof, accessible via stairwell. RFI #21 Question: Could you identify the roof system types for the approximately 15 roof areas (for example, EPDM, TPO, modified bitumen, built-up/ballasted, etc.)? This will help us determine the appropriate moisture survey methodology. Answer: Refer to existing drawings for roof type. RFI #22 Question: The PWS references existing roof plan files. Are those plans available to offerors before award, or will they only be provided to the successful contractor? Answer: Photos of existing drawings attached. RFI #23 Question: If limited test cuts or core samples become necessary to verify concealed roof conditions, would prior written approval from the VA be required before performing that work? Answer: Written approval is required prior to any destructive testing/investigation. RFI #24 Question: I would also appreciate clarification regarding the insurance requirement. If Nine3Six Solutions serves as the prime contractor and utilizes a qualified roofing inspection subcontractor to perform the on-site technical inspection services, does the solicitation require the prime contractor to maintain the insurance specified in the solicitation, or would the subcontractor's insurance satisfy that requirement for the services they perform? Answer: Yes, the prime contractor shall maintain the required insurance and not the subcontractor. RFI #25 Question: Lastly, I noticed Attachment VAAR 852.219-75 (Limitations on Subcontracting Certificate). Since this procurement is identified as a Total Small Business Set-Aside under NAICS 541350 rather than a VOSB or SDVOSB set-aside, could you please confirm whether that attachment is applicable to this acquisition? Answer: This has been rescinded (VAAR 852.219-75).
Response Dead Line
Jul 31, 2026
Full Parent Path Name
DEPARTMENT OF VETERANS AFFAIRS.DEPARTMENT OF VETERANS AFFAIRS.250-NETWORK CONTRACT OFFICE 10 (36C250)
Place Of Performance
Solicitation Number
36C25026Q0698