Light RFP
Federal · SAM.gov · Lead, SD

Argon Piping Supply, Installation and Testing

This opportunity closed on Jul 27, 2026. Browse current bids below.
Closed Jul 27, 2026·General ConstructionView official posting ↗
Issuing agency
Department of Energy
Method
Solicitation
Category
Construction · NAICS 236210
PIN
73573
Location
Lead, SD
Posted
Jul 17, 2026
Takeaways by LightRFP AI
  • The Department of Energy is soliciting for the supply, installation, and testing of a stainless-steel argon gas pipeline as part of the DUNE experiment.
  • The place of performance is Lead, South Dakota.
  • Proposals are due on July 27, 2026.
  • The solicitation was posted on July 17, 2026.
  • Amendment 2 was issued on July 17, 2026, providing additional questions and answers.
  • The scope includes approximately 40,000 metric tons of argon transport from surface to the 4850 Level.
  • The pipeline will be 8” and 6” diameter Schedule 10 stainless steel.
  • Requirement: If Subcontractor is required to provide a performance bond under the terms of the Subcontract, Subcontractor shall have an ES&H Program that is commensurate with the complexity and nature of the work.

AI-generated, verify all details against the official documents.

Description

**July 17, 2026 - Amendment 2 is issued to proviide additional questions and answers to this RFP. Documents are attached. The Proposal due date is unchanged, proposals are due on 27 July 26. **

July 8, 2026 - Amendment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attached link.

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.

This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.

Documents20
Copy of 2026.07.10 - Questions #2 - U2623.xlsxXLSX
Amend 02 to RFP LBNF-735735-JK.pdfPDF
K-3 FL-11_Rev1.pdfPDF
K-4 FL-57B (Rev. 1-07).pdfPDF
K-2 SARC_Subcontractor Annual RepsCerts Rev 4.pdfPDF
K-1 PUR-466_Proposal Certifications-.pdfPDF
J-11 Price Sheet including Fully Burdened Hourly Rate.xlsxXLSX
J-10 South Dakota Wase Determinatin 20260016.txtTXT
J-9 FL-55 Small Business Subcontracting Plan (Rev. 6-23) 14.0 - Exhibit III-G.pdfPDF
J-7 014100-8-2025-South Dakota Quality Requirements.pdfPDF
J-6.1 7010_F1_Fermilab Subcontractor Safety Information Questionnaire.docxDOCX
J-6 013100_7-31-2025 FermiForward_South_Dakota.pdfPDF
J-5 010010_General_Requirements_SD_4_2025_FFDG.docxDOCX
J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024.pdfPDF
J-3 Argon Piping Supply and Install SOW (2).docxDOCX
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdfPDF
J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025).pdfPDF
RFP Argon Piping R1 6.1.2026.docxDOCX
1. RFP Letter 6.1.2026 R1.docxDOCX
Document 20Link

Contact

Name
Jerry King
Phone
(217) 390-1120
Address
Lead, SD 57754
Full source recordfrom SAM.gov
Type
Solicitation
Title
Argon Piping Supply, Installation and Testing
Active
Yes
Base Type
Solicitation
Notice Id
142c48620ba64615a2328803ff507fa2
Naics Code
236210
Department
DEPARTMENT OF ENERGY
Posted Date
Jul 17, 2026
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f227e9ad9c124a1881310274245efd66/download?fn=Copy%20of%202026.07.10%20-%20Questions%20%232%20-%20U2623.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/36a9a95195964dd2aa313fc7c6b18cc7/download?fn=Amend%2002%20to%20RFP%20LBNF-735735-JK.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/441ced0a6fd24e1b9b12f8f1002d9707/download?fn=K-3%20FL-11_Rev1.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/331dbcc3e073446ea615eaa847b78328/download?fn=K-4%20FL-57B%20(Rev.%201-07).pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9c4f2f29bfec412e9a9ebe02fde83719/download?fn=K-2%20SARC_Subcontractor%20Annual%20RepsCerts%20Rev%204.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cae7bc1c28e34f439c0b49ec125446be/download?fn=K-1%20PUR-466_Proposal%20Certifications-.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eae4f7e3b05a494983ed18c2190e5e6d/download?fn=J-11%20Price%20Sheet%20including%20Fully%20Burdened%20Hourly%20Rate.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1f30c4921e024646a8b7a67bfefe6a6f/download?fn=J-10%20South%20Dakota%20Wase%20Determinatin%2020260016.txt, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c245671b6f744e4e9d59bce27bfd180e/download?fn=J-9%20FL-55%20Small%20Business%20Subcontracting%20Plan%20(Rev.%206-23)%2014.0%20-%20Exhibit%20III-G.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/60fe93609724468a8e6f8e72d7e73cfe/download?fn=J-7%20014100-8-2025-South%20Dakota%20Quality%20Requirements.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fda48a9cdaee4418b9c0296ac83fd5d1/download?fn=J-6.1%207010_F1_Fermilab%20Subcontractor%20Safety%20Information%20Questionnaire.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e26922f7c06245efa8df55c5ab0bf0ba/download?fn=J-6%20013100_7-31-2025%20FermiForward_South_Dakota.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/791adab065ba4b8cb4bd5b5ee3b579b6/download?fn=J-5%20010010_General_Requirements_SD_4_2025_FFDG.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/707e57999743482ca564b5f3490917ee/download?fn=J-4%20SDSTA%20Risk%20Transfer%20Protocol%20Manual%20Final%20July%2012%202024.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/896ed4936b404a7aa21702f3b93cb21b/download?fn=J-3%20Argon%20Piping%20Supply%20and%20Install%20SOW%20(2).docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/26bfcf6505d244e68029f45e68f8e179/download?fn=J-2%202025%20INSURANCE%20REQUIREMENTS%20FOR%20FRA%20SUBCONTRACTED%20WORK%20AT%20SURF%20Risk%20category%203%20(Rev%2001.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8b693dc7a0da4691ac96e2a37831f165/download?fn=J-1%20FFDG%20General%20Terms%20and%20Conditions%20for%20Construction%20at%20SURF%20(08.2025).pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0d87d7f8c8ad4134a84ac61a9047b04d/download?fn=RFP%20Argon%20Piping%20R1%206.1.2026.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c869d2194a24489998f1d09b40d33165/download?fn=1.%20RFP%20Letter%206.1.2026%20R1.docx, https://fermicloud-my.sharepoint.com/:f:/g/personal/awehrli_services_fnal_gov/IgBrHrX4k517RYL_CamJn9mhAciKjPXL1Mxatw_f8eTYq88?e=0qhlRU
Point Of Contact
Type
primary
Email
jking@fnal.gov
Phone
2173901120
Full Name
Jerry King
Type
secondary
Email
susanu@fnal.gov
Phone
6308402021
Full Name
Susan Underwood
Description Text
**July 17, 2026 - Amendment 2 is issued to proviide additional questions and answers to this RFP. Documents are attached. The Proposal due date is unchanged, proposals are due on 27 July 26. ** July 8, 2026 - Amendment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attached link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
Response Dead Line
Jul 27, 2026
Full Parent Path Name
DEPARTMENT OF ENERGY.DEPARTMENT OF ENERGY.FERMILAB - DOE CONTRACTOR
Place Of Performance
Zip
57754
City
Code
36220
Name
Lead
State
Code
SD
Name
South Dakota
Country
Code
USA
Name
UNITED STATES
Solicitation Number
73573

Source: SAM.gov (notice 142c48620ba64615a2328803ff507fa2), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.