UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Research Reactors Division at Oak Ridge National Laboratory is in need of Keithley Instruments/Tektronix, Picoammeter/Voltage Source, and Calibration. Brand Name or Equal Shall Apply.
Please see Attachment C_ Bill of Materials for RFQSSPR496408 for specifications and details.
Attachments:
Attachment A_Terms-Conditions-Purchase-Order-Commercial-Products-Services-BSD-CS-2154-01.13.2026
Attachment B_Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026
Attachment C_Bill of Materials for RFQSSPR496408
Attachment D_Reps-and-Certs-Abbreviated-2026.03.09
Attachment E_Commercial Computer Software
Request for Quotation- RFQSSPR496408
The contractor shall furnish and deliver three Keithley 6487 Picoammeter/Voltage Sources and three calibration services (part number RE0401-9) with a 12-month calibration interval, as specified in Attachment C-Bill of Materials for RFQSS496408. The contractor shall provide a firm fixed price quotation stating lead-time and country of origin, and must be an authorized reseller of the items. The work includes on-site delivery to Oak Ridge National Laboratory with the requirement that drivers be U.S. citizens, and all electrical equipment must be listed or field-evaluated by a nationally recognized testing laboratory.
We post new equipment maintenance & rental opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""37831""Oak Ridge""TN""USA""Oak Ridge National Laboratory""PO Box 2008""Questions and Answers for RFQSSPR496408 (09.10.2026).pdf"20323"file"".pdf""1""2026-09-10T20:05:53.093+00:00""482261ea7ec5465bb88ae951f5ebd26c""public""0""public""cd13e4216e9a4b3f8f567ad30a730ac3""0"7"0""Attachment A_Terms-Conditions-Purchase-Order-Commercial-Products-Services-BSD-CS-2154-01.13.2026.pdf"262316"file"".pdf""1""2026-09-09T13:48:57.974+00:00""f167b12d7cb746cf9ce8251ccca68126""public""0""public""bc05dff6ec244de98f5629203a461c53""0"6"0""Attachment B_Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf"305416"file"".pdf""1""2026-09-09T13:48:57.974+00:00""b8b7149cb8154c438a275d2ecebefe99""public""0""public""bd77bf25afdf40ae9affce15814c6c29""0"5"0""Attachment C_Bill of Materials for RFQSSPR496408.pdf"404173"file"".pdf""1""2026-09-09T13:48:57.974+00:00""702a0b0d9f5f4007b498e588555dfb8c""public""0""public""3c6bd8007c5142119cdecc9ab599c1e4""0"4"0""Attachment D_Reps-and-Certs-Abbreviated-2026.03.09.pdf"973009"file"".pdf""1""2026-09-09T13:48:57.974+00:00""8a4df212e22d457abe960c47739186dd""public""0""public""97920d04173f4385b7b2caac375d9b72""0"3"0""Attachment E_Commercial Computer Software.pdf"172184"file"".pdf""1""2026-09-09T13:48:57.974+00:00""93addb86d642420ca2ab4bf9b8f484bc""public""0""public""fba1dbdb2dcb4f5e9550270433f35e2b""0"2"0""Request for Quotation-RFQSSPR496408.pdf"217487"file"".pdf""1""2026-09-09T13:48:57.974+00:00""803592d8b1ff4f83a0b5803a9d0679f3""public""0""public""0398d3c90c4d4f53a4dc2d479657e3e7""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 0fee2ce5325e4285ba040d1727bd66e5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.