Light RFP
Federal · SAM.gov · Newport, RI

Construction - NUWCDIVNPT - Consolidated Secure Facility

Due Jul 31, 2026·3 days left·General ConstructionView official posting ↗
Issuing agency
Department of Defense
Method
Solicitation
Category
Construction · NAICS 236220
PIN
N6660426R0163
Location
Newport, RI
Posted
Jul 23, 2026
Takeaways by LightRFP AI
  • The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) is soliciting offers for construction of a Consolidated Secure Facility (Project B162) at Newport, RI.
  • The procurement is a 100% small business set-aside under NAICS 236220 with a disclosure of magnitude between $5,000,000 and $10,000,000.
  • Offers are due by 31 July 2026 at 2:00 PM EST and must be emailed to Amy.K.Prisco.civ@us.navy.mil and Michael.N.Ouellette.civ@us.navy.mil.
  • A mandatory site visit is scheduled for 7 July 2026 at 10:00 AM EST at Building 80, NUWC Division Newport.
  • Technical information is required with submission of offer per Sections L and M; offerors not submitting this information risk exclusion from award.
  • A bid guarantee is required to be considered for award.
  • Performance and payment bonds are required within 10 calendar days after award.
  • The contract includes a 20-year roofing warranty covering both labor and materials.
  • The contractor is responsible for complete structural foundation design including seismic and wind design.
  • Modular structural panels must be third-party certified to meet a minimum 1-hour fire-resistance rating per UL 263 or ASTM E119.
  • The contractor must provide no less than 14 voice outlets throughout the facility.
  • Standby power is not required at this time.
  • The Government will provide the Construction Security Plan to the award recipient at the start of the design phase.
  • The Government will designate a secured laydown area adjacent to the facility site for modular components.
  • Requirement: Active registration in SAM.gov
  • Requirement: Small business size standard per NAICS 236220 (100% set-aside)
  • Requirement: Bid guarantee required with offer
  • Requirement: Performance and payment bonds required within 10 calendar days after award
  • Requirement: 20-year roofing warranty covering both labor and materials
  • Requirement: Contractor responsible for complete structural foundation design
  • Requirement: Modular structural panels third-party certified to 1-hour fire-resistance rating per UL 263 or ASTM E119
  • Requirement: Provide no less than 14 voice outlets throughout the facility
  • Requirement: Prevailing wage requirements apply per Attachment 2 - Wage Determination

AI-generated, verify all details against the official documents.

Description

Please see Amendment 0002 to include Attachments 12 and 13.

N6660426R0163-00001 - 16 July 2026

The purpose of this amendment is to:

  1. extend submission deadline from July 17, 2026 to July 31, 2026;

  2. provide a disclosure of magnitude between $5,000,000 and $10,000,000; and,

  3. attach the following applicable documents:

  • AD 21: Conceptual Layout Plan,

  • AD 22: Area Site Plan, and

  • AD 23: Site Utility Plan.

All other terms and conditions remain unchanged.

NOTE:

All submitted RFIs are currently undergoing technical and administrative review by the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) program and contracting team.

Government responses to all timely RFIs along with any associated updates will be formally published and incorporated into the solicitation via Amendment 0002.

Offerors are instructed to monitor the government point of entry (SAM.gov) regularly for the release of Amendment 0002.


The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for a Consolidated Secure Facility. Please see attached Solicitation (N6660426R0163) and all attachments for full information and details regarding this requirement.

Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.

Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.

A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.

You must request access to the attachment by clicking on its title and providing the reason you need access.

You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.

Your entity is responsible for managing the documents in accordance with prescribed directives.

https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a

Documents10
Attachment 13_RFI_001.pdfPDF
Solicitation Amendment 0002 N6660426R01630002 SF 30.pdfPDF
N6660426R0163-0001 .pdfPDF
Solicitation - N6660426R0163.pdfPDF
Attachment 2 - Wage Determination.pdfPDF
Attachment 5 - Key Personnel.pdfPDF
Attachment 6 - Hazmat Usage Log.pdfPDF
Attachment 7 - Generator Usage Log.pdfPDF
Attachment 8 - Site Visit Instructions.pdfPDF
Attachment 9 - AD 21 Conceptual Layout Plan_17 11 2025.pdfPDF

Contact

Name
Amy Prisco
Address
Newport, RI 02841
Full source recordfrom SAM.gov
Hit
Id
0ac2b85356704eddb81fc77d3d6c0651
Type
Code
o
Value
Solicitation
Type
opportunity
Award
Awardee
Title
Construction - NUWCDIVNPT - Consolidated Secure Facility
R Score
0
Is Active
Yes
Is Canceled
No
Publish Date
Jul 23, 2026
Descriptions
Content
<p>Please see Amendment 0002 to include Attachments 12 and 13.&nbsp;</p> <p>N6660426R0163-00001 - 16 July 2026</p> <p>The purpose of this amendment is to:</p> <p>1) extend submission deadline from July 17, 2026 to July 31, 2026;<br /> 2) provide a
Last Modified Date
Jul 23, 2026
Modified Date
Jul 23, 2026
Response Date
Jul 31, 2026
Modifications
Count
2
Parent Notice Id
d63efe91fe6344fd9ddc243023a903e6
Response Time Zone
America/New_York
Response Date Actual
Jul 31, 2026
Solicitation Number
N6660426R0163
Organization Hierarchy
Code
9700
Name
DEPT OF DEFENSE
Type
DEPARTMENT
Level
1
Status
active
Address
Organization Id
100000000
Code
1700
Name
DEPT OF THE NAVY
Type
AGENCY
Level
2
Status
active
Address
Organization Id
300000188
Code
NAVSEA
Name
NAVSEA
Type
MAJOR COMMAND
Level
3
Status
active
Address
Organization Id
100005213
Code
NAVSEA WARFARE CTR
Name
NAVSEA WARFARE CENTER
Type
SUB COMMAND
Level
4
Status
active
Address
Organization Id
100076477
Code
N66604
Name
NUWC DIV NEWPORT
Type
OFFICE
Level
5
Status
active
Address
Zip
"02841-1703"
City
"NEWPORT"
State
"RI"
Country
"USA"
Street Address
"1176 HOWELL ST"
Organization Id
100226863
Type
Solicitation
Title
Construction - NUWCDIVNPT - Consolidated Secure Facility
Active
Yes
Detail
Type
o
Naics
Code
236220
Type
primary
Title
Construction - NUWCDIVNPT - Consolidated Secure Facility
Archive
Date
Aug 15, 2026
Type
auto15
Version
2
Permissions
IVL
Read
Yes
Create
Yes
Delete
Yes
Update
Yes
Solicitation
Set Aside
SBA
Deadlines
Response
Jul 31, 2026
Response Tz
America/New_York
Organization Id
100226863
Point Of Contact
Type
primary
Email
amy.k.prisco.civ@us.navy.mil
Full Name
Amy Prisco
Type
secondary
Email
michael.n.ouellette.civ@us.navy.mil
Full Name
Michael Ouellette
Classification Code
Y1AZ
Place Of Performance
Zip
02841
City
Code
49960
Name
Newport
State
Code
RI
Name
Rhode Island
Country
Code
USA
Name
UNITED STATES
Solicitation Number
N6660426R0163
Additional Reporting
none
History
History
Index
3
Title
Construction - NUWCDIVNPT - Consolidated Secure Facility
Latest
1
Deleted
0
Action Date
2026-07-23T18:26:19.903+00
Action Type
publish
Posted Date
2026-07-23T18:26:19.896+00
Request Type
modify
Cancel Notice
0
Archive Notice
0
Opportunity Id
0ac2b85356704eddb81fc77d3d6c0651
Procurement Type
o
Solicitation Number
N6660426R0163
Parent Opportunity Id
d63efe91fe6344fd9ddc243023a903e6
Index
2
Title
Construction - NUWCDIVNPT - Consolidated Secure Facility
Latest
0
Deleted
0
Action Date
2026-07-16T12:46:17.099+00
Action Type
publish
Posted Date
2026-07-16T12:46:17.096+00
Request Type
modify
Cancel Notice
0
Archive Notice
0
Opportunity Id
ac6eeeb4383947b592e9e8a2f2a485ee
Procurement Type
o
Solicitation Number
N6660426R0163
Parent Opportunity Id
d63efe91fe6344fd9ddc243023a903e6
Index
1
Title
Construction - NUWCDIVNPT - Consolidated Secure Facility
Latest
0
Deleted
0
Action Date
2026-06-18T14:14:17.626+00
Action Type
publish
Posted Date
2026-06-18T14:14:17.621+00
Request Type
submit
Cancel Notice
0
Archive Notice
0
Opportunity Id
d63efe91fe6344fd9ddc243023a903e6
Procurement Type
o
Solicitation Number
N6660426R0163
Base Type
Solicitation
Notice Id
0ac2b85356704eddb81fc77d3d6c0651
Naics Code
236220
Resources
Attachments
Name
"Attachment 13_RFI_001.pdf"
Size
151646
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-23T18:26:19.896+00:00"
Resource Id
"fd264fdf6da14bebab41b4cd765f13a4"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"444918a0a0f94f76b6e3c5513ba71965"
Explicit Access
"0"
Attachment Order
68
Export Controlled
"0"
Name
"Attachment_12 AD_1_2_3_25.pdf"
Size
13967887
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-23T18:26:19.896+00:00"
Resource Id
"482fcce336be45c5aeded3b4909c996a"
Access Level
"private"
Deleted Flag
"0"
Access Status
"controlled"
Attachment Id
"2a9a4bd96cb64a17b76926be2b2ad8f3"
Explicit Access
"1"
Attachment Order
67
Export Controlled
"0"
Name
"Solicitation Amendment 0002 N6660426R01630002 SF 30.pdf"
Size
623339
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-23T18:26:19.896+00:00"
Resource Id
"b192c0777dac4033bc57e25092a4fe1e"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"83d3b88d9d2f4cd9ac883c9de4400cc3"
Explicit Access
"0"
Attachment Order
66
Export Controlled
"0"
Name
"N6660426R0163-0001 .pdf"
Size
624343
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-16T12:46:17.096+00:00"
Resource Id
"9054f7c5bf314311843bd644d23a764a"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"f1533fcd367e464f8f7f8f4bacbe8a42"
Explicit Access
"0"
Attachment Order
65
Export Controlled
"0"
Name
"Solicitation - N6660426R0163.pdf"
Size
945766
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"77feb496893f47899e0f99833068e55a"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"15bd14b945634c0f81ecc2c60dcc7134"
Explicit Access
"0"
Attachment Order
64
Export Controlled
"0"
Name
"Attachment 1 - Statement of Work.pdf"
Size
149253
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"88de853833364c36b75fad3c61217345"
Access Level
"private"
Deleted Flag
"0"
Access Status
"controlled"
Attachment Id
"df1158ea5cb74ed780869aba0ef233eb"
Explicit Access
"1"
Attachment Order
60
Export Controlled
"0"
Name
"Attachment 2 - Wage Determination.pdf"
Size
197967
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"4d57dabf634e42e8977bf2b299a339e3"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"b67d2d8a14854bbfbc457932da92553a"
Explicit Access
"0"
Attachment Order
51
Export Controlled
"0"
Name
"Attachment 3 - Soil Management Plan_Redacted.pdf"
Size
2876314
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"78471b5cb8fb4c50a2bee46616f1cb7d"
Access Level
"private"
Deleted Flag
"0"
Access Status
"controlled"
Attachment Id
"3c9acff903b14e2d8f45d6ea324ba0b8"
Explicit Access
"1"
Attachment Order
46
Export Controlled
"0"
Name
"Attachment 4 - DD254_Redacted.pdf"
Size
3028008
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"ae90cd8ffb6844269869c4774043a69f"
Access Level
"private"
Deleted Flag
"0"
Access Status
"controlled"
Attachment Id
"d05ce0599365470a9f114300dedafc67"
Explicit Access
"1"
Attachment Order
42
Export Controlled
"0"
Name
"Attachment 5 - Key Personnel.pdf"
Size
60403
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"53da49272e2942269b05cf8d8fa858f9"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"c3bc3fd36a474cdba190721852579cef"
Explicit Access
"0"
Attachment Order
36
Export Controlled
"0"
Name
"Attachment 6 - Hazmat Usage Log.pdf"
Size
165739
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"79c967980bae437ca9704de8110fa09a"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"d2b37c58c2c84c6481bd8a0ec8eb3195"
Explicit Access
"0"
Attachment Order
30
Export Controlled
"0"
Name
"Attachment 7 - Generator Usage Log.pdf"
Size
506261
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"8af531e0183b4af0a96b9b90541892c4"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"61c7004445a04cc6a0c23357d77a1164"
Explicit Access
"0"
Attachment Order
23
Export Controlled
"0"
Name
"Attachment 8 - Site Visit Instructions.pdf"
Size
200182
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-06-18T14:14:17.621+00:00"
Resource Id
"e758d723a9054fad8e6c19bf5f0d891b"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"fc0878670344407e9a88d979822849e8"
Explicit Access
"0"
Attachment Order
16
Export Controlled
"0"
Name
"Attachment 9 - AD 21 Conceptual Layout Plan_17 11 2025.pdf"
Size
135756
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-16T12:46:17.096+00:00"
Resource Id
"2d7f827a067446c2b7fcc34744983a8f"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"cfc9d2802fb44191a8b9d3200f6086e2"
Explicit Access
"0"
Attachment Order
13
Export Controlled
"0"
Name
"Attachment 10 - AD 22 Area Site Plan_3 12 2025.pdf"
Size
1196604
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-16T12:46:17.096+00:00"
Resource Id
"d0c3de5f0b8649b8bf714f31df7ba737"
Access Level
"private"
Deleted Flag
"0"
Access Status
"controlled"
Attachment Id
"18773388e39548fc8012e74652310717"
Explicit Access
"1"
Attachment Order
11
Export Controlled
"0"
Name
"Attachment 11 - AD 23 Site Utility Plan_3 12 2025.pdf"
Size
314292
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-16T12:46:17.096+00:00"
Resource Id
"0208d57d3f45443fa9f094b7e08018f3"
Access Level
"private"
Deleted Flag
"0"
Access Status
"controlled"
Attachment Id
"3d2c68c858a84153a3fc395c854927dd"
Explicit Access
"1"
Attachment Order
10
Export Controlled
"0"
Opportunity Id
0ac2b85356704eddb81fc77d3d6c0651
Department
DEPARTMENT OF DEFENSE
Posted Date
Jul 23, 2026
Categorized By
llm
Detail Fetched
Yes
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fd264fdf6da14bebab41b4cd765f13a4/download?fn=Attachment%2013_RFI_001.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b192c0777dac4033bc57e25092a4fe1e/download?fn=Solicitation%20Amendment%200002%20N6660426R01630002%20SF%2030.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9054f7c5bf314311843bd644d23a764a/download?fn=N6660426R0163-0001%20.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/77feb496893f47899e0f99833068e55a/download?fn=Solicitation%20-%20N6660426R0163.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4d57dabf634e42e8977bf2b299a339e3/download?fn=Attachment%202%20-%20Wage%20Determination.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/53da49272e2942269b05cf8d8fa858f9/download?fn=Attachment%205%20-%20Key%20Personnel.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/79c967980bae437ca9704de8110fa09a/download?fn=Attachment%206%20-%20Hazmat%20Usage%20Log.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8af531e0183b4af0a96b9b90541892c4/download?fn=Attachment%207%20-%20Generator%20Usage%20Log.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e758d723a9054fad8e6c19bf5f0d891b/download?fn=Attachment%208%20-%20Site%20Visit%20Instructions.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2d7f827a067446c2b7fcc34744983a8f/download?fn=Attachment%209%20-%20AD%2021%20Conceptual%20Layout%20Plan_17%2011%202025.pdf
History Fetched
Yes
Point Of Contact
Type
primary
Email
amy.k.prisco.civ@us.navy.mil
Full Name
Amy Prisco
Type
secondary
Email
michael.n.ouellette.civ@us.navy.mil
Full Name
Michael Ouellette
Description Text
Please see Amendment 0002 to include Attachments 12 and 13. N6660426R0163-00001 - 16 July 2026 The purpose of this amendment is to: 1) extend submission deadline from July 17, 2026 to July 31, 2026; 2) provide a disclosure of magnitude between $5,000,000 and $10,000,000; and, 3) attach the following applicable documents: - AD 21: Conceptual Layout Plan, - AD 22: Area Site Plan, and - AD 23: Site Utility Plan. All other terms and conditions remain unchanged. NOTE: *All submitted RFIs are currently undergoing technical and administrative review by the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) program and contracting team.* *Government responses to all timely RFIs along with any associated updates will be formally published and incorporated into the solicitation via Amendment 0002.* *Offerors are instructed to monitor the government point of entry (SAM.gov) regularly for the release of Amendment 0002.* ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for a Consolidated Secure Facility. Please see attached Solicitation (N6660426R0163) and all attachments for full information and details regarding this requirement. Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV. Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV. A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter. You must request access to the attachment by clicking on its title and providing the reason you need access. You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access. Your entity is responsible for managing the documents in accordance with prescribed directives. https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a
Resources Fetched
Yes
Response Dead Line
Jul 31, 2026
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE NAVY.NAVSEA.NAVSEA WARFARE CENTER.NUWC DIV NEWPORT
Place Of Performance
Zip
02841
City
Code
49960
Name
Newport
State
Code
RI
Name
Rhode Island
Country
Code
USA
Name
UNITED STATES
Solicitation Number
N6660426R0163

Source: SAM.gov (notice 0ac2b85356704eddb81fc77d3d6c0651), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.