PRE-BLEND 7 SACK DRY MIX (GUNITE) - Colorado River Agency
The contractor shall prepare, mix and deliver pre-blend 7 sack dry mix concrete (Gunite) to CRIIP construction sites anywhere throughout the Colorado River Indian Tribal Reservation. The gunite mix shall consist of a ratio of 7:1 (7 parts gunite to 1 part sand, Mix Code 80015). Quantities ordered will be per truck load of approximately 8 cubic yards, with a base required quantity of 1088 yards. The contractor shall supply all required tools, equipment, materials, management, labor, and subject matter experts needed to successfully process, mix, and deliver the material. Delivery is to be scheduled with the government COR, and the contractor must inspect delivered material for compliance.
We post new goods & materials opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""85004""PHOENIX""AZ""USA""2600 N CENTRAL AVE STE 400 MAILROOM""Sol_140A1126Q0073_Amd_0001.pdf"213293"file"".pdf""1""2026-08-20T22:55:36.601+00:00""ba46d75ebc0746a28f834dc936a2a72d""public""0""public""b32c8d7c36e34e61adda8fe9f1124d4b""0"4"0""Sol_140A1126Q0073.pdf"594942"file"".pdf""1""2026-08-19T00:01:49.611+00:00""683f7a85a7b1487e9c7ae107a42592e0""public""0""public""edd1e7ff14284534ac580771e538bc69""0"3"0""A04_SOW.pdf"156516"file"".pdf""1""2026-08-19T00:01:49.611+00:00""112d0631ac2c4bc29380004f733edce7""public""0""public""ad752ac3d8be4c9db81f2fc02e852ead""0"2"0""IA_-_IEE_Representation_Form.pdf"29473"file"".pdf""1""2026-08-19T00:01:49.611+00:00""6d9ff232dc134d6486827cdfc9883468""public""0""public""3aec382c7dd54d56839288ea4ee76d07""0"1"0"Most Arizona work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 0a2b5144e17048b7b59918001ad7f216), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.