Read the notice and its 5 attached documents and pull out the scope, the deadlines and what you have to submit.
The U.S. Army Corps of Engineers (USACE) Nashville District (LRN) is procuring an action for a firm fixed-price supply contract to purchase and deliver one (1) brand new Vacuum Circuit Breaker (VCB) to USACE Center Hill Dam, 270 Lancaster Road, Lancaster, TN 38569. The contractor’s work shall consist of furnishing all labor, materials, and equipment necessary to purchase and deliver one (1) brand new 150VCP-WG-50-3000A Eaton vacuum circuit breaker. The Generator Vacuum Circuit Breaker (VCB) shall be designed to work with EATON VacClad-W Metal-Clad Switchgear.
VCB part number to replace is 3759A72H12. The new VCB must work with the Center Hill Power plant Eaton switchgear unit and cabinet configuration, if not it will be rejected for non-compatibility.
We post new goods & materials opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"37203-1070""NASHVILLE""TN""USA""KO CONTRACTING DIVISION""801 BROADWAY RM A604""KO Determination- Limiting Competition at or below the SAT (25 Aug 2026)_Redacted.pdf"720040"file"".pdf""1""2026-09-09T18:24:15.007+00:00""b6a1a92a739d408aabe85b5666b5d39d""public""0""public""e98324f416494b5a97175a2a271aa6e4""0"5"0""Solicitation - W912P526QA048.pdf"3307721"file"".pdf""1""2026-09-02T22:16:47.308+00:00""18caa4c3db14485988acf0dd4f39c56e""public""0""public""c950e27b227f41ab85f31d41acb17d21""0"4"0""Center Hill VCB - SOW SPECS(2 Sep 2026).pdf"676672"file"".pdf""1""2026-09-02T22:16:47.308+00:00""86d103697638483287471c56950a5c29""public""0""public""9040268be3614e8cbe4421c50fd7b0a0""0"3"0""Center Hill VCB - Price Schedule.pdf"210379"file"".pdf""1""2026-09-02T22:16:47.308+00:00""a63cb531c08d40ee86a6260125c82b00""public""0""public""994eae8dc16b4d90b9817984ccd67717""0"2"0""Quote Instructions - Center Hill - VCB(2 Sep 2026).pdf"163002"file"".pdf""1""2026-09-02T22:16:47.308+00:00""b402e142b83249c49ef5031c50fcb132""public""0""public""fb035b955e6f42b097c56532ce80892c""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 094992a6c1ae47819eaa2603e7325867), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.