Read the notice and its 5 attached documents and pull out the scope, the deadlines and what you have to submit.
The Contractor shall furnish all labor, supervision, materials, supplies, equipment, tools, and transportation required for maintaining six elevators, in a continuously safe, reliable, and satisfactory operating condition and to perform all inspections and testing as required. Five (5) elevators are located at Naval Air Station Meridian, MS, and one (1) elevator is located at Outlying Joe Williams Field in Kemper County, MS. The Contractor will provide recurring monthly services, periodic testing, and non-recurring on-demand repair services to the Government in exchange for compensation. The Contractor must conduct operations in compliance with the American Society of Mechanical Engineers Safety Code for Elevators and Escalators (ASME A17 series), the contract Performance Work Statement (PWS), and all applicable state, local, and federal laws.
We post new electrical opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"32212-0030""NAS JACKSONVILLE""FL""USA""PO BOX 30""BLDG 903""Solicitation - N6945026Q0008.pdf"2049502"file"".pdf""1""2026-08-26T01:21:15.106+00:00""4d068d9da4fd4b1687c3fa93152c5293""public""0""public""506cccbcd7c94bc1af7fba7b790dc8af""0"5"0""Solicitation - Attachment Past Performance Questionnaire (PPQ-0).pdf"830820"file"".pdf""1""2026-08-26T01:21:15.106+00:00""ac8833b34181400198fed6a94fc92cd1""public""0""public""e7bcf4b7788045e48f286170e58f4bfd""0"4"0""Solicitation - Attachment Instructions to Offerors (Details).pdf"228605"file"".pdf""1""2026-08-26T01:21:15.106+00:00""b51f9e2750c344d6b4eb9b91cb261d99""public""0""public""6191e6acfc9b43ddbe945945f837b14b""0"3"0""Solicitation - Attachment Wage Determination 2004-0401 Revision 42.txt"10187"file"".txt""1""2026-08-26T01:21:15.106+00:00""3b8d9d66b48b4dc4a216065726bda9ac""public""0""public""a99ac64bcdd24dfc9622c35555b06ad5""0"2"0""Solicitation - Attachment Activity Hazard Analysis (Template).pdf"31282"file"".pdf""1""2026-08-26T01:21:15.106+00:00""9875335adcb1438580a5544e4c2b8046""public""0""public""561a31233afe4665880e5bfdd43306f9""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 07335772cff447f0acd6377c5121ad61), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.