We post new interior installation opportunities in Kansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The work consists of furnishing all plant, labor, equipment, and materials to perform all work in strict accordance with the plans and specifications to replace building 635’s exterior doors, frames and locking mechanisms.
The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to remove
and replace twenty-one (21) exterior door assemblies on the main level, including associated frames,
hardware, access control components, and adjacent infill systems. All work shall comply with WBDG 08 11 16, manufacturer requirements, and UFC life-safety provisions.
I. New exterior doors shall be commercial-grade aluminum stile-and-rail doors, fabricated from 6063-T6 architectural aluminum extrusions.
II. Frames shall be aluminum, factory-fabricated, and fully compatible with the door system.
III. Doors and frames shall be factory-finished/applied baked-on powder coating; field touch-up only.
IV. Finishes shall color match to existing conditions.
The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to remove and replace twenty-one (21) exterior door assemblies on the main level, including associated frames, hardware, access control components, and adjacent infill systems. Additionally, replace seven (7) exterior doors and associated frames on the basement level. All work shall comply with WBDG 08 11 16, manufacturer requirements, and UFC life-safety provisions. New exterior doors shall be commercial-grade aluminum stile-and-rail doors, fabricated from 6063-T6 architectural aluminum extrusions. Frames shall be aluminum, factory-fabricated, and fully compatible with the door system. Doors and frames shall be factory-finished/applied baked-on powder coating; field touch-up only. Finishes shall color match to existing conditions.
"66027-1391""FT LEAVENWORTH""KS""USA""MISSION AND INSTI CONTRACTING""BLDG 338""Construction Wage Determination_KS20260053_Building_20260518.pdf"209479"file"".pdf""1""2026-07-30T19:41:47.41+00:00""4f0463dc8530445992b85d690b549a9d""public""0""public""ae351751febc48d5872beefe7cf841ea""0"3"0""SOW B635 - Doors Repair Project Rev4.pdf"646576"file"".pdf""1""2026-07-30T19:41:47.41+00:00""866c0cfd922140dd9dccde60e49967fe""public""0""public""c9a2999bf9cc4864996d136a65c0eeeb""0"2"0""Sol_W91QF4-26-B-A008 B635 Doors.pdf"6608657"file"".pdf""1""2026-07-30T19:41:47.41+00:00""8b76d6cc32c64bff93fe363709d01aad""public""0""public""abe8541036304914a37a76505263a5b5""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 01ba501737f14662870ad7c9297776ad), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.