SOLICITATION FOR WATER TREATMENT AND MAINTENANCE
AMENDMENT TO ADD A SITE VISIT, QUESTION DUE DATE, ANSWER QUESTIONS AND EXTEND THE QUOTE DUE DATE.
The contractor must provide water system treatment and maintenance including Legionella testing for cooling towers (SPX Model# NG8413XAS1, 1200 ton, 3600 GPM, QTY:3), chilled water loop (entire campus), and closed loops. Services include monthly Legionella testing with remediation included, monthly onsite service, monitoring and maintaining existing Siemens controls, liquid chemicals, and third-party testing for all closed loops. The contractor is responsible for replacing chemical feed equipment if needed. No glycol is present. The base period is 12 months, with two optional 12-month periods.
We post new fuel & energy opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""36C24626Q1007 0001.pdf"253222"file"".pdf""1""2026-09-08T18:17:24.39+00:00""4ab3a121884e4670a96b20db31792065""public""0""public""c1a1bcffb8de401a8c26982285d5c93d""0"3"0""ATTACHMENT A WAGE DETERMINATION 2015-4423 REV 35 DTD 08-22-2026.pdf"352443"file"".pdf""1""2026-09-01T17:56:43.326+00:00""efa2d05840d54e05829fc224713669fe""public""0""public""fae03583b3d443bd93dbe56f33c700a5""0"2"0""36C24626Q1007.docx"85939"file"".docx""1""2026-09-01T17:56:43.326+00:00""7703d82976334fe59e486635340f1543""public""0""public""1852608de42d4d35b4a1eea8ab26f257""0"1"0"Most North Carolina work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 00a772aa9312434bbb91902050c67e56), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.